久久伊人精品青青草原2021&精品欧美一区成人&99在线热播&国产在线欧美日韩精品一区&精品亚洲aⅴ在线无码播放&德国妓女精品性hd&欧美肥婆精品一区二区

 

Newly built 36 meter automatic stereoscopic warehouse in Beifei

Project location: Daxing, Beijing

Project time: 2019

Service content: CD+BD+DD

Building area: 2,600㎡

Project introduction: Beijing Fresenius Kabi's new automatic stereoscopic warehouse project is a new GMP warehouse, with high requirements for temperature and humidity environment. The project adopts three sets of double-extension stacker cranes and 11 rows or racks, which can provide about 8,500 goods sections, with fully automatic access to goods. It maximizes the use of the whole area of the plant.

Category:
  • toolbar
    Back to Top