久久伊人精品青青草原2021&精品欧美一区成人&99在线热播&国产在线欧美日韩精品一区&精品亚洲aⅴ在线无码播放&德国妓女精品性hd&欧美肥婆精品一区二区

 

Installation of the Equipment Required by the Purification System and Related Services for Xinyi Hospital of Traditional Chinese Medicine Relocation and New Hospital Construction Project

Construction time: August 1, 2015 - July 28, 2017

Building area: 101,451㎡, Clean area: 3,500㎡

Cleanliness level: Class 100 - 100,000, meeting the corresponding testing standard - Architectural Technical Code for Hospital Clean Operating Department (GB 50333-2013)

Scope of contracting:construction, clean decoration and general decoration, HVAC, electrical engineering, weak current, water supply and drainage, medical gas, and exhaust gas emission within the shaded range of the design drawing of central supply room on the second floor, ICU and operating department on the third floor, equipment floor and UPS room on the fourth floor, and delivery room on the fifth floor (areas excluding stairwell and elevator room);

Project highlights: a comprehensive Grade II Level A traditional Chinese medicine hospital integrating medical treatment, teaching, scientific research, rehabilitation, health care, and pre-disease treatment.

real shots of the panorama after the completion of the project

 
 
Real shots of exterior view  

 

  • toolbar
    Back to Top