Mianyang BOE B11 Secondary Distribution A Package

Construction time: June 17, 2018 - March 30, 2019

Building area: 27,600㎡

Clean area: 10,000㎡

Cleanliness level: Class 10 - 1,000

Scope of contracting: BP plant secondary distribution

Category:

Project highlights:The Mianyang G6 Flexible AMOLED Production Line Project is the second flexible production line of BOE, which is also a key step of BOE's realization of its strategic layout of flexible displays. The total investment of this production line is planned to be RMB 46.5 billion.

Industry value:this project is one of the most advanced flexible OLED panel production lines in China.